Eight disciplines of problem solving
Construction Quality Planning Guide, Draft for Consultation, Published by the Construction Innovation Hub in May 2020, suggests that the Eight Disciplines of Problem Solving (8D) refers to: ‘A problem-solving approach originally developed by the Ford Motor Company, now used throughout the automotive industry; it has also been successfully applied in other industries, e.g., manufacturing, healthcare, and finance. A useful tool in both product and process improvement, 8D is a methodology for identifying, correcting and eliminating recurring problems.'
Introduction to Construction Quality Planning, Applying APQP to construction manufacturing, published by the Construction Innovation Hub in December 2019, suggests that the problem-solving methodology Eight Disciplines of Problem Solving (8D): ‘…is often used in the manufacturing sector …. The 8D method has been developed to identify the root cause for any non-conformances found in the product. Such a situation arises when the internal or external customer receives a product and later identifies that the product has issues with its ‘fit, form or function’. The 8D method can then be used to contain the stock, define the problem, identify and verify the root cause(s) of the non-conformance and put in place corrective as well as preventative measures. This is fed back into the FMEA (Failure Mode and Effects Analysis) tools and the Control Plans ensuring ongoing continuous improvement.’
[edit] Related articles on Designing Buildings
- Advanced product quality planning.
- Construction Innovation Hub.
- Construction product approval process.
- Construction quality planning.
- Failure Mode and Effects Analysis.
- Not right first time.
- Plan, Do, Check, Act (PDCA).
- Process control.
- Project quality plan.
- Quality control.
- Quality cost and delivery.
- Quality in construction projects.
- Quality load and capacity report.
- Quality.
Featured articles and news
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.